Current submitted capability baseline — September 2026
- Sprint reporting with executive summary/briefing, RAG, Delivery Health, scope, workload, velocity, quality and detailed Jira evidence.
- Project / Program reporting across included Scrum-board contexts.
- Editable Management Commentary with Generated, Draft and Published states.
- Configurable estimation, RAG, readiness, Acceptance Criteria, accessibility and KPI visibility.
- Custom Jira Insights using saved filters, supported Jira dashboard visuals and custom JQL.
- Browser-generated PDF and editable PowerPoint.
- Confluence publishing with create/update behaviour, native report content, PDF/PPT attachments and stable attachment filenames.
- Reporting Scheduler with Google Calendar, Outlook and recurring ICS options.
- Focused deterministic StatusDeck Assistant with Instant, Medium and High analysis modes.
- Short-lived report caching, fair-use counters, licensing and operational controls in Atlassian Forge.
Recent documentation/product alignment
- Expanded public documentation from Sprint-only wording to Sprint, Project and Program reporting.
- Added dedicated Jira ↔ Confluence Marketplace-review test guide.
- Updated public permissions page to match the current manifest, including Confluence scopes.
- Updated privacy/data-processing documentation for persisted commentary overlays, schedules, reporting settings and publication metadata.
- Documented current Custom Jira Insights, Scheduler and Assistant behaviour.
Release policy
Material changes to Jira/Confluence scopes, storage, subprocessors, data handling, security controls or major reporting behaviour are reflected in the corresponding trust and user documentation.
Documentation baseline: 3 September 2026. This documentation describes the current submitted StatusDeck capability set and is updated when material product, permission, storage or security behaviour changes.